Getting back to work

Elbow is feeling better and it is high time to get back to work! I got most of this done before my injury, so I’m just catching up on the blog. The outer frame of the stand is just held together with glue and nails. That’s really not gonna cut it. I added a second inner frame that connects all of the pieces together more firmly. Then I put cross supports on the top and bottom to support the bases for the tank and sump.

Inner Frame Added

I wanted to see how the front door would look, so I went a little bit out of order and made that next. It is made out of 1×6 and 1×2 sides. I think it came out really nice. There is an 1/8″ gap between each horizontal board to allow for some air flow.

Front door

Next up are the bases for the sump and tank to sit on. These are just made out of 3/4″ pine plywood. I decided not to do cutouts for the frame in the sump so I would have a lip for a support on the door to sit on. The frame was racked by about 1/4″ which was really annoying, but thankfully easy to fix. I nailed the front edge of the base to the top of the stand and then clamped the other end to pull it straight. Popped in a few more nails and it was back to square 🙂

Bases loaded!

From here I’m going to paint the inside of the stand and then stain the outside so I can finally get the tank back on here and cycling. Once that’s all going I can finish building the doors and stain them separately.

More to follow…